What Is a Pilot Project and How to Run a Software Pilot

Basics4 min

In short

A pilot is launching a new system in a limited part of the business with success criteria set in advance. It shows whether the solution works in real conditions before you commit resources to a company-wide rollout.

What a pilot project is

A pilot project is a rollout of a new system in a small part of the business: one branch, one department, one product line or a subset of customers. The goal is to check in real work whether the system solves the problem and to find issues while they are still cheap.

A pilot differs from testing and from a prototype. Testing checks that the software works without bugs. A prototype shows an idea. A pilot checks that real people do real work better with the system than before.

How to choose the pilot scope

A good pilot area is:

  • typical, not exceptional, so results can be applied to the rest;
  • active enough to generate data during the pilot;
  • isolated, so a failure does not stop the whole business;
  • with a clear "before": you can compare metrics with a previous period or another area.

Avoid both extremes: the best-performing branch (results will be too optimistic) and the most troubled one (the system will be blamed for everything).

Who you need on the pilot team

RoleResponsibility
Executive sponsorProvides resources, makes the final decision
Pilot ownerRuns the pilot, collects feedback
Key usersUse the system daily, report problems
Contractor representativeFixes bugs and makes small changes quickly
Analyst or data ownerCalculates metrics and compares with the baseline

Make sure users have time for the pilot. If working in the new system is piled on top of a normal workload, results will be skewed.

How to set success criteria

Define criteria before the start and write them down. Otherwise everyone will see in the results what they wanted to see.

Good criteria are:

  • measurable: time to process a request, number of errors, share of operations without manual corrections;
  • tied to the goal of the rollout, not to interface convenience as such;
  • thresholded: what counts as success, partial success and failure;
  • inclusive of qualitative signals: are staff willing to keep using the system, which complaints keep repeating.

Example wording: "The pilot succeeds if requests are processed faster than last quarter, no request is lost, and most key users are willing to continue working in the system."

How long a pilot should run

There is no universal duration. Use the process cycle as a guide: a pilot should cover at least one full work cycle, ideally several.

  • if the process repeats daily, a few weeks can be enough;
  • if month-end closing, reporting or seasonality matter, the pilot should include them;
  • the first days go to getting used to the system, so do not evaluate from day one.

A pilot that is too short shows only transition pains. One that is too long becomes an "eternal pilot", where nobody dares to either roll out or shut down.

How to decide what happens after the pilot

There are three possible decisions:

  1. Roll out further: criteria are met and there are no critical issues. Plan a phased expansion.
  2. Improve and repeat: the idea works, but there are problems to solve. Record the list of changes and a date for re-evaluation.
  3. Stop: the system does not solve the problem. That is still a valuable result; you spent less than a full rollout would have cost.

Before expanding, prepare training based on the pilot experience, update the instructions and appoint internal mentors from among the pilot users.

Common mistakes

  • No success criteria, so the outcome is decided by gut feeling.
  • A pilot without support: bugs take weeks to fix and users lose faith.
  • Parallel work in the old system without rules: data diverges and there is nothing to compare.
  • Ignoring feedback: users stop reporting problems.

FAQ

If the rollout touches a core process, yes, even in a simplified form: for example, one team or one line of business uses the system for a while before everyone switches. This reduces the risk of disrupting the business.

We can help with this

If you'd rather get the result than figure it all out yourself — this is what we do every day.

Discuss a project

Read next

Have an idea or a task? Tell us about it

We'll reply within one business day and propose a solution. The consultation is free.