Predictive maintenance puts sensors on critical equipment, streams their readings to a model that learns normal behavior and flags deviations early, so you repair machines when they actually need it rather than by calendar or after failure.

What predictive maintenance is

There are three maintenance strategies:

  • Reactive — fix it when it breaks. Cheap until a critical machine stops the line.
  • Planned (preventive) — service by calendar or operating hours. Predictable, but parts are often replaced while still healthy, and failures between services still happen.
  • Predictive — service based on the actual condition of the equipment, measured continuously by sensors.

Predictive maintenance does not "predict the future" in a magical way. It detects that a machine has started to behave differently from its normal state, early enough to plan a repair.

Which sensors measure what

SensorWhat it catchesTypical equipment
Vibration (accelerometer)Bearing wear, imbalance, misalignment, loosenessMotors, pumps, fans, gearboxes, compressors
TemperatureOverheating, friction, lubrication problems, electrical faultsBearings, motors, panels, hydraulics
Current (CT clamp)Load changes, motor electrical faults, jams, tool wearAny electric drive, spindles, conveyors
Pressure, flowLeaks, clogged filters, pump degradationHydraulics, pneumatics, cooling systems
Acoustic / ultrasonicLeaks, early bearing defects, electrical dischargeCompressed air, valves, bearings

Start with vibration plus temperature on rotating equipment and current where adding a vibration sensor is hard. Current sensors are non-invasive and often the cheapest way to start.

Also check what the machine already reports: many modern drives and PLCs expose current, speed and temperature, and that data is free.

The data pipeline

A typical architecture:

  1. Sensors and gateways collect readings. Vibration needs high sampling rates, so the gateway often computes features at the edge (RMS, peak, frequency bands) instead of sending raw waveforms.
  2. Transport — usually MQTT or OPC UA to a central broker or server.
  3. Storage in a time-series database, tagged by machine, sensor and operating mode.
  4. Analytics — rules and models run on the stream.
  5. Action — alerts to maintenance staff and work orders in the CMMS (maintenance management system).

The last step is where many projects fail: an alert that does not become a work order is just noise.

Anomaly detection models

You rarely have enough recorded failures to train a classic "failure / no failure" classifier. So most projects start with unsupervised anomaly detection:

  • Thresholds and trends — alarm levels on vibration RMS or temperature, often based on equipment standards. Simple, explainable, surprisingly effective.
  • Statistical baselines — learn normal ranges per operating mode (speed, load, product).
  • Machine learning — isolation forest, autoencoders or similar models that learn the normal pattern and score how unusual new data is.
  • Remaining useful life — estimating time to failure; requires history of degradation and is usually a later stage.

Key point: normalize for operating mode. A motor at full load looks "anomalous" compared to idle. Without context the model will raise false alarms and staff will stop trusting it.

Choosing a pilot

Pick equipment that is:

  • critical — its failure stops production or is expensive to repair;
  • failure-prone in a way sensors can see (mechanical wear, overheating);
  • numerous or similar — several identical pumps or motors allow comparison;
  • accessible for installing sensors and connectivity;
  • owned by a maintenance team willing to act on alerts.

Define success before starting: which failures you want to catch, and how you will verify alerts against inspections.

Calculating ROI against planned maintenance

Do not promise a number up front; build the model from your own data:

  • Cost of unplanned downtime per hour on that line: lost output, overtime, scrap, late deliveries.
  • History of failures on the pilot equipment: how often, how long, how much each repair cost.
  • Planned maintenance cost that could be extended or avoided: parts replaced early, labor, scheduled stops.
  • Secondary damage prevented when a bearing is replaced before it destroys a shaft.
  • Project cost: sensors, gateways, connectivity, software, integration and the team's time to respond to alerts.

Compare scenarios honestly. For cheap, non-critical equipment, run-to-failure or planned maintenance is often the rational choice.

Common mistakes

  • Instrumenting everything at once instead of a focused pilot.
  • Collecting data with no one responsible for reacting.
  • Ignoring operating context and drowning in false alarms.
  • Not recording maintenance events, so models cannot be validated.

FAQ

No. Thresholds and trends on vibration and temperature often catch a large share of mechanical problems. Add models once you have clean data, labeled events and a team that trusts the alerts.

We can help with this

If you'd rather get the result than figure it all out yourself — this is what we do every day.

Discuss a project

Read next

Have an idea or a task? Tell us about it

We'll reply within one business day and propose a solution. The consultation is free.