Risk Management in IT Projects: A Checklist for Clients

Practice3 min

In short

List risks in five groups (people, scope, tech, integrations, deadlines), rate each by likelihood and impact, assign an owner and an action, and review the list at every project meeting.

The essentials

Risk management is not a thick document. It is a short list of what could go wrong, with a clear answer to "what are we doing so it does not happen". As a client you do not need to read code: it is enough to know the typical risks, keep a simple register and update it regularly with the team.

Five groups of risks

People

  • A key developer leaves, and the knowledge leaves too.
  • Nobody on the client side can make decisions quickly.
  • The team is overloaded with parallel projects.

Mitigation: documentation and code review so knowledge does not live in one head; one business owner with the authority to decide.

Scope

  • Requirements keep changing and the project keeps growing.
  • Different people understand the task differently.

Mitigation: fix the scope of the first version, put new ideas into a backlog and estimate every change separately.

Technology

  • The chosen stack is unfamiliar to the team.
  • Load, security or backups were not thought through.

Mitigation: a small technical prototype for risky parts, and an architecture review before the main development starts.

Integrations

  • An external service (payment provider, 1C, CRM, government API) behaves differently from its documentation.
  • Access to a partner's test environment arrives late.

Mitigation: request access in the first week and build integrations early instead of leaving them for the end.

Deadlines

  • The estimate is a single number with no buffer.
  • Testing and bug fixing are not in the plan.

Mitigation: ask for estimates as ranges, reserve time for testing, split the project into stages with demos.

A simple risk register

A plain table is enough. Rate likelihood and impact as low / medium / high.

RiskLikelihoodImpactActionOwner
Late access to the bank APIMediumHighRequest access in week oneClient manager
Lead developer leavesLowHighDocumentation, code reviewTech lead
Scope growthHighMediumBacklog and estimate per changeProduct owner

Start with the high-impact risks: those are the ones that can stop a project.

Client checklist

  • One person is assigned to make project decisions.
  • The scope of the first version is written down and agreed.
  • Access to all external services has been requested.
  • The code lives in your own repository.
  • There are regular demos of working software, not just reports.
  • The risk register is reviewed at least every couple of weeks.
  • There is a plan for a missed key deadline.

Common mistakes

  • Writing the register once and never opening it again.
  • Listing risks without a concrete action and owner.
  • Treating risks as the vendor's problem only.

FAQ

Usually the vendor's project manager maintains it, but the client takes part: many risks such as decisions, access and requirements sit on the client side.

We can help with this

If you'd rather get the result than figure it all out yourself — this is what we do every day.

Discuss a project

Read next

Have an idea or a task? Tell us about it

We'll reply within one business day and propose a solution. The consultation is free.